Skip to content
Menu
Request a Quote
Printed drawing with numbered balloons next to a dimensional inspection report and a machined part
Technical guide

What to Look for in an Inspection Report

For supplier quality engineers and technical buyers receiving machined parts with reports.

A report is evidence that specific characteristics were measured on specific parts under stated conditions. This guide explains how to read that evidence, what it leaves unproven and what to agree before the order.

What a Report Can and Cannot Prove

An inspection report shows that certain characteristics, on certain parts, were measured by a stated method in a stated condition, with the results recorded. Read it in exactly those terms. It says nothing about characteristics that are not listed, pieces that were not measured, or anything that happened afterwards, such as finishing after inspection or damage in transport.

Several different documents are loosely called a report. A first article inspection verifies every drawing characteristic on an initial part; a dimensional or CMM report may cover a selection; a certificate of conformance is a signed statement without data; a material certificate concerns the stock rather than the part. Knowing which one you hold tells you which question it answers.

Related: Quality and inspection

Common Report and Certificate Types

The table compares documents commonly supplied with machined parts. Names and formats vary between industries and companies, so confirm the expected document type and its content when you place the order, rather than relying on the title printed at the top of the page you eventually receive.

DocumentWhat it showsWhat it does not show
First article inspection (FAI) reportEvery drawing characteristic measured on an initial part, often with material and process records; AS9102 defines one widely used formatThat later parts or batches conform
Dimensional or CMM reportResults for the listed characteristics on the listed partsUnlisted characteristics, material properties or electrical performance
Certificate of conformanceA signed statement that the parts meet the orderMeasured values; it relies on records you do not see
Material test report, EN 10204 type 2.2Compliance declared with results from non-specific, typical production testingResults for the actual heat or lot supplied
Inspection certificate, EN 10204 type 3.1Results for the delivered lot, validated by an inspection representative independent of manufacturingThat this lot became your parts, unless traceability is kept
Finishing or process certificateSpecification, batch and checks performed by the processorDimensions after finishing, unless they were measured

Certificates follow the material

a type 3.1 certificate belongs to the mill or stockist lot. Ask how the lot or heat number is carried through cutting and machining to your parts.

Header Fields That Tie a Report to Your Parts

Before reading any result, check that the report describes your parts. Most avoidable mismatches appear in the header: an old revision, a different batch or an unstated condition makes every value below it questionable. Check these fields first, and ask for a corrected report rather than accepting the original with a handwritten note.

Part number and drawing revision

matching the order and the parts received.

Serial, batch or lot number

with the quantity inspected against the quantity delivered.

Part condition and date

before or after finishing, free state or restrained, and when it was measured.

Equipment

the instrument or CMM identification and a calibration reference.

Reference drawing

the ballooned drawing that the characteristic numbers refer to.

Approval

the inspector's name or signature and, where required, a second approval.

Read Each Line Against the Ballooned Drawing

A ballooned drawing numbers every characteristic, and each report line should carry the same number.

Drawing excerpt with numbered balloons connected by lines to matching rows of a dimensional report table

Each balloon number matches one report line with limits, value, unit and method — concept illustration

For each line, compare the requirement and limits with the drawing itself, not only with the report's own tolerance column, which can be mistyped. Then check the unit, the actual value, the method and the result. A characteristic reported only as conforming, without a value, is a statement rather than a measurement.

Look for gaps in the numbering. Missing balloons usually mean characteristics that were not measured, sometimes because they could not be reached, and the report should say how those were verified or state that they were not. If you accept a gap, record the reason together with the report so the next lot is checked the same way.

Related: What to include in a CNC machining RFQ

Geometric Tolerances in CMM Reports

Geometric tolerances need more care than sizes. A position tolerance is evaluated in the datum reference frame named in its feature control frame, so the report should state the alignment used, and that alignment should match datums A, B and C on the drawing. A program aligned to convenient faces can produce values that look valid but answer a different question. For a cylindrical tolerance zone, position should be reported as a diametral value, not only as separate X and Y offsets.

Where a tolerance carries a maximum material condition modifier, the permitted position deviation grows as the feature departs from its maximum material size. The report should show the actual size and the bonus applied, otherwise the result cannot be checked. Flatness, profile and runout results should identify the surface evaluated and how many points were measured or scanned.

Related: Antenna mounting structures · Defining waveguide drawing requirements

Point density

a flatness or profile result from a handful of probed points describes those points. If coverage matters, agree a minimum number of points or a scanning method before the order.

Uncertainty, Decision Rules and Results Near a Limit

Every measurement has an uncertainty, and a result close to a tolerance limit may lie on either side of it. ISO 14253-1 sets a default rule that takes uncertainty into account when proving conformance or non-conformance, but many purchase agreements use simpler rules. Decide which applies before the order, especially for features whose tolerance is small compared with the capability of the measuring method.

When your incoming measurement disagrees with the supplier's report, first check that both refer to the same part, revision, characteristic and datum alignment. Then compare part condition, temperature, method and the probe or gauge used. Sharing set-up details usually resolves the difference faster than repeating measurements independently on each side.

Related: Quality and inspection · Surface finishing and dimensional requirements

Agree the Report Before the Order

Most report problems can be prevented at the request-for-quotation stage. A supplier prices inspection time and paperwork, so the required report has to be known before the price is fixed. The items below make the expected evidence explicit and give your receiving inspection a document it can check quickly.

Report type: first article, dimensional, CMM or certificate only, per part number.

Coverage: all characteristics, critical ones only, or a named sampling plan.

Format: your form, the supplier's form or a standard format such as AS9102.

Material and process documents: certificate type and finishing records.

Identification: serial or batch numbering that links each part to its records.

Questions About Inspection Reports

Is a first article inspection needed for every order?

Normally not. A first article inspection verifies a new part, a new revision or a changed process. Repeat orders of an unchanged part are usually accepted on the agreed routine inspection. Many standards call for a new or partial first article after a design change, a process change or a long production gap, so define those triggers in the order.

Can a certificate of conformance replace a dimensional report?

It can when the order allows it and you have confidence in the supplier's process. A certificate states that the parts conform but carries no measured values, so it gives receiving inspection nothing to compare with the drawing. For critical features or a new supplier, buyers typically ask for measured results on at least those features.

What is the difference between EN 10204 type 3.1 and 3.2?

Both report test results for the specific material delivered. A type 3.1 certificate is validated by the manufacturer's own inspection representative, who is independent of the manufacturing department. A type 3.2 certificate is additionally validated by the purchaser's representative or a third-party inspector named in the order, which takes longer to arrange and is requested when a specification calls for it.

Should the report use our form or the supplier's?

Either can work if the content is agreed. Your own form makes receiving inspection faster and consistent across suppliers, but it has to be sent with the request so the effort is quoted. If the supplier's form is used, check that it carries every header field and characteristic you need before the first delivery.

Discuss Inspection and Report Requirements

Send the drawing, the characteristics you consider critical and the report and certificate types you expect with delivery.

Sales contact photo to be confirmed

Sales contact (pending)

Name, role and photo to be confirmed

Drawings are optional for an initial discussion.

Start with the information you have; file exchange can be arranged afterward.

Name to be confirmed

Sales, company name to be confirmed

  • If you use your own report form, include it.
  • A short description of the parts and their acceptance needs is enough to begin.

Project Inquiry

Fields marked  are required.